Project servicesInterior Fit Out ApprovalsRestaurant, Cafe & Shisha Cafe ApprovalsVilla Modification ApprovalsSwimming Pool & Landscaping ApprovalsWarehouse & Industrial ApprovalsRenovation & Refurbishment ApprovalsArchitectural, Structural & MEP DrawingsBuilding Permits & Completion CertificatesBuilding Extension & Structural Modification Approvals
Approval guidesAboutContact
Request a quote
Authority approvals

DEWA NOC Coordination

Many building permits and modifications need clearance from Dubai Electricity and Water Authority (DEWA). We coordinate the DEWA NOC as part of the overall approval package so it does not hold up the permit or the completion.

  • Authority ready drawings prepared by our engineers
  • Submissions, comments and follow up handled for you
  • Through to permit, NOC or completion certificate
Dubai skyline and road network
Overview

How DEWA approvals work

DEWA reviews electrical and water aspects of building projects, such as load requirements, substation and meter room provisions, and connections. Its NOC or clearance is often part of the permit or completion documentation required by the building authority.

We handle DEWA as part of a complete approvals package for building permits, modifications and completion certificates. We do not offer DEWA services as a standalone product.

Projects we handle

  • New villas and buildings
  • Extensions that change the electrical load
  • Building modifications affecting services
  • Completion and service connection stage
Process

Approval stages

The exact steps depend on the scope and the plot. This is the usual sequence we manage.

  1. Requirement check

    We identify the DEWA clearances the permit or completion needs.

  2. Drawings and load details

    MEP drawings and load details prepared or coordinated with your MEP engineer.

  3. Submission

    DEWA submission and follow up.

  4. Clearance

    NOC or clearance added to the authority package.

Documents

Typical documents

  • Title deed, affection plan or site plan for the plot
  • Proposed architectural, structural and MEP drawings
  • Electrical load schedule and MEP drawings
Our scope

What we do

  • Jurisdiction and feasibility check before any spend
  • Drawing preparation, or review and conversion of your consultant's drawings
  • Landlord, master developer and authority submissions, made through appropriately registered professionals where required
  • Responses to authority comments and resubmissions
  • Coordination of inspections with your contractor
  • Permit, NOC and completion documents handed over to you

Every authority has its own checklist and it changes from time to time. We send you the exact list for your project after the first review.

FAQ

DEWA approval questions

Do you provide DEWA services on their own?

We coordinate DEWA NOCs as part of a building permit, modification or completion package. For standalone DEWA connection work we will direct you to a suitable specialist.

Have drawings or an authority comment sheet?Send them on WhatsApp and an engineer will tell you what is needed next.
Get started

Tell us about your project

Share the plot or unit location and a short description of the works. An engineer reviews it and replies with the approval route and a quotation.

Request a quote

  1. We review your scope and location
  2. We confirm the authority, approvals and documents
  3. You receive a clear quotation