Warehouse and Industrial Modification Approvals
We manage approvals for warehouses, factories and logistics facilities. Mezzanines, racking, steel structures, office build outs, change of use and fire system upgrades, across DM, Trakhees, JAFZA, Dubai South and other industrial areas.
- Authority ready drawings prepared by our engineers
- Submissions, comments and follow up handled for you
- Through to permit, NOC or completion certificate

How the approval process works
Industrial modifications usually involve structural and fire and life safety reviews. Adding a mezzanine or high bay racking changes floor loads, escape distances and sprinkler coverage. Changing the use of a warehouse can change its fire classification.
Our engineering background in industrial construction helps us prepare drawings that answer these questions up front. The authority depends on location: Dubai Municipality for mainland industrial areas, Trakhees for JAFZA and other Trakhees areas, and the relevant authority in other zones.
Projects we handle
- Mezzanine floors and platforms
- High bay racking
- Steel extensions, canopies and shades
- Office build outs inside warehouses
- Change of use and storage classification changes
- Fire alarm and sprinkler upgrades
What to know before you start
Design points authorities check in warehouses
Warehouse approvals usually turn on a few technical points. We address them in the drawings before submission.
- Sanitary provisions for the number of staff
- Parking and loading provisions
- Mezzanine area, loading and escape limits
- Fire separation, sprinkler coverage and smoke ventilation for the storage type
- Structural adequacy of slabs and steel for racking and new loads
Approval stages
The exact steps depend on the scope and the plot. This is the usual sequence we manage.
Survey and route
Site survey, existing approvals and authority route.
Structural and FLS design
Calculations and drawings for structure and fire safety.
Submissions
Authority and Civil Defence submissions.
Permit and works
Permit issue and coordination during works.
Completion
Inspections and completion certificate.
Typical documents
- Title deed, affection plan or site plan for the plot
- Tenancy contract and Ejari (for tenant works)
- Trade licence of the tenant (for commercial premises)
- Existing approved drawings and the building completion certificate
- Proposed architectural, structural and MEP drawings
- Fire and life safety drawings where systems are added or altered
- Contractor appointment letter and contractor trade licence
What we do
- Jurisdiction and feasibility check before any spend
- Drawing preparation, or review and conversion of your consultant's drawings
- Landlord, master developer and authority submissions, made through appropriately registered professionals where required
- Responses to authority comments and resubmissions
- Coordination of inspections with your contractor
- Permit, NOC and completion documents handed over to you
Every authority has its own checklist and it changes from time to time. We send you the exact list for your project after the first review.
Frequently asked questions
Does high bay racking need Civil Defence approval?
Racking above certain heights affects fire protection and escape requirements and normally needs FLS review. We assess your layout and advise.
Can you also build the works?
Hydrock Contracting LLC, our partner company, carries out industrial construction and modification works.
Related approvals
JAFZA Approvals
JAFZA approvals for warehouse, factory, office and showroom works in Jebel Ali Free Zone. JAFZA tenant procedures…
View serviceAuthorityTrakhees CED & EHS
Trakhees CED and EHS approvals for buildings, fit out, villa modifications and industrial works in Trakhees areas…
View serviceAuthorityDubai Civil Defense (DCD)
Dubai Civil Defense (DCD) approvals for fit out, buildings, fire alarm and firefighting systems. Fire and life…
View serviceTell us about your project
Share the plot or unit location and a short description of the works. An engineer reviews it and replies with the approval route and a quotation.
- WhatsApp+971 55 492 9782
- Mobile+971 55 492 9782
- Office04 431 5558
- Emailinfo@dubaiapprovals.ae
- AddressUnit 103, Eros Building, Street 3, Al Quoz 3, Dubai
- HoursMon to Sat, 8:00 am to 5:00 pm
Request a quote
- We review your scope and location
- We confirm the authority, approvals and documents
- You receive a clear quotation
No obligation. We reply during working hours and use your details only to respond. Privacy policy